What is a pre-construction condition survey?
- A pre-construction condition survey documents
the visible condition of buildings, structures, and surrounding features before
construction begins. It establishes a photographic and written baseline that
can be referenced during or after construction.
Why are pre-construction condition surveys required?
- Condition surveys help establish a clear record
of existing conditions before potentially disruptive construction activities
such as excavation, demolition, drilling, piling, tunnelling, or heavy
equipment operation.
What areas are included in a condition survey?
- Depending on the project requirements and
available access, surveys may include building interiors and exteriors,
foundations, walls, ceilings, floors, driveways, sidewalks, retaining walls,
fences, and other structures or site features.
Do you provide post-construction condition surveys?
- Yes. i2m can perform interim and
post-construction surveys to document conditions during or following
construction and compare observable conditions with the original baseline
survey.
Can condition surveys be combined with vibration
monitoring?
- Yes. i2m can integrate condition surveys with
vibration, noise, settlement, structural, geotechnical, and automated
monitoring programs to provide coordinated construction monitoring support.
Does i2m assist with property access and Permit to Enter
coordination?
- Yes. i2m can support clients throughout the
property access and coordination process, including preparation of Permit to
Enter (PTE) notices, coordination and communication with property owners and
other third parties, delivery of survey notices, follow-up on access requests,
and scheduling of condition surveys. This helps streamline access coordination
and maintain clear documentation of communication and access attempts
throughout the condition survey program.
What happens if a property owner does not respond or
provide access?
- i2m can document communication and access
attempts, including delivery of notices and follow-up correspondence. Where
interior access cannot be obtained, exterior conditions may be documented from
publicly accessible areas where appropriate and in accordance with project
requirements.